

![]() |
| ||||||||
UsageStrongcoat Matt is applied by brush or roller in a minimum of two coats and has very good durability towards pedestrian and vehicular traffic. It also has very good resistance towards many of the chemicals commonly found in an industrial environment (consult our Technical Department for further details). Curing to a matt finish, Strongcoat Matt provides a finish that gives very good slip resistance. Materials Supplied5kg. CoverageApproximately 8m² / kg at the specified coating thickness. This coverage figure is based on application to a smooth, dense surface. Coverage figures will vary according to the texture, porosity and evenness of the surface on which the Strongcoat Matt is being applied. When used as a seal on top of Strongcoat materials listed above, this coverage will be increased to approximately 10-12m² / kg. StorageStore at temperatures between 5°C and 30°C. Shelf LifeApproximately 12 months if stored in unopened containers and under good conditions. Technical Information
|
Application InstructionsSURFACE PREPARATION The surface must be clean, dry (less than 75% RH measured by hygrometer) and free of dust laitance, oils, paints or other forms of contamination. Grit blasting can be used to remove laitance and surface contamination (see the DCP Guide to Surface Preparation for more details). For treatment of surfaces containing expansion joints, consult our Technical Department. MIXING Taking care to ensure that the bottom and sides are thoroughly scraped, transfer the entire contents of the Strongcoat Matt Hardener container into the Resin container and, using a Jiffy-type mixer attached to a slow running electric drill, mix for approximately two minutes. Never mix Strongcoat Matt by hand as this could lead to areas of uncured material. APPLICATION Once mixing is complete, transfer the Strongcoat Matt to a roller tray, and using a medium-pile simulated sheepskin roller, apply it evenly over the surface. When used as a seal coat over other Strongcoat products, a two-coat application should be applied by a short-pile simulated sheepskin or foam roller to avoid any puddling of material. If applying to Cemflow Topping, a first coat of Strongcoat WD Clear should be applied followed by a coat of Strongcoat Matt. WORKING TIME Strongcoat Matt has a working time of approximately 20 minutes at 20°C. Never leave the mixed Strongcoat Matt kit to stand for any length of time prior to application as this will considerably shorten its working time. CLEANING Once mixing and application are complete, tools can be cleaned with water. CURING TIME At 20°C, Strongcoat Matt should be allowed to cure for 24 hours prior to opening it to pedestrian traffic. At the same temperature, Strongcoat Matt should be allowed to cure for approximately seven days prior to opening it to vehicular traffic or exposing it to chemical contamination (consult our Technical Department for details of curing times at other temperatures). OVERCOATING Further coats of Strongcoat Matt must be applied no later than 24 hours after the preceding coat has cured (see Curing Time). Additionally, Strongcoat Matt must not be contaminated prior to applying a further coat. WORKING CONDITIONS Strongcoat Matt should not be applied at temperatures less than 10°C. HEALTH AND SAFETY Consult the appropriate Material Safety Data Sheets prior to using Strongcoat MATT. GENERAL GUIDANCEThis data sheet is for general guidance purposes only and may contain information that is inappropriate for certain conditions of use. Accordingly, all recommendations and suggestions are made without guarantee. Further information is available from our Technical Department. |
Download file
Related products
Connect with Don Construction Products
Don Construction Products Ltd.
Headquarters
Tel: +44 (0) 1440 766360
Fax: +44 (0) 1440 768897